How long do I have to stay off my driveway after you finish?
- For sealcoat you have to stay off the driveway for 24 hours. For paving you need to stay off the new asphalt for 3-5 days.
What do I do if I get oil or gas on my driveway?
- Wash the area with liquid laundry detergent and a stiff brush rinse with water.
What do I do if I get a crack in my driveway?
- All asphalt cracks. It is important to keep any large ¼” or larger cracks filled. Small cracks will be filled with just sealcoat.
What is the difference between hot crack fill and cold crack fill?
- Hot crack fill is applied at 350 degrees and has a higher rubber content, it is used for larger cracks. Cold crack fill is a caulking material and is fine to use on smaller cracks.
Where do you perform work?
- We work all over the greater Chicago area.
Can I use salt on my driveway during the winter?
- Yes, but we do recommend to use salt sparingly.
My new driveway seems to soften when it gets hot, what can I do?
- Asphalt softens when there is a lot of heat absorbed into driveway. If we get a few very hot days in a row, we suggest watering the driveway to cool it off when you water the grass or flowers.
How long have you been in business?
- We have been in the asphalt business since 1984.